Authority plans new charts to navigate Likoni floating bridge

President Uhuru Kenyatta with Mombasa Governor Hassan Joho during the commissioning of the 1.2km Likoni Pedestrian Floating Bridge in Mombasa December 10, 2020. The bridge will be opened to the public on January 1, 2021. PHOTO | KEVIN ODIT | NMG

The Sh1.9 billion Likoni floating bridge which connects Mombasa Island to the South Coast has altered the navigational charts for mariners.

Kenya Maritime Authority (KMA) will be putting up a shipping notice to port stakeholders informing them on the maritime navigational changes.

PAYE Tax Calculator

Note: The results are not exact but very close to the actual.